Overview

McCarran Nevada Data Center | Electrical TI Project

RM
Ryan McCann - Commissioning
KPIs & Schedule
Team Assignments
Key Performance Indicators
Contract Value
$24.8M
Electrical TI Package
Overall Completion
62%
On track for Q3 delivery
Active Personnel
147
Across all shifts
AI Agents Active
18
ARTECK Platform
Electrical Systems Progress
MV Switchgear78%
Conduit Rough-In71%
Cable Tray55%
Lighting42%
Fire Alarm28%
Commissioning15%
Communication22%
Key Metrics
Open RFIs
34
Pending Submittals
18
Open COs
12
Safety Days
87
Labor Productivity
94.2%
Budget Variance
-3.1%
OFCI Items
22/31
Team Assignments
NameRoleFocus AreaStatus
Ryan McCannCommissioning ManagerCx Planning & ExecutionActive
Chris MorrisSenior Project ManagerProject OversightActive
Eddie PaceGeneral SuperintendentField OperationsActive
Monroe DiamondProject ManagerScheduling & CoordinationActive
Fred BrodishQA/QC ManagerQuality AssuranceTravel
Adam LiningerSafety ManagerSafety ProgramsActive
Cole CasillasField EngineerInstallation SupportActive

Welcome to ARTECK Chat

Ask questions about the McCarran Data Center Electrical TI Project

What is the project status?
Show schedule risks
Who handles commissioning?
Summarize open RFIs

Prompt Suggestions

Project Status

Overall project completion summary
Critical path activities
Budget variance analysis

Safety & Compliance

Safety incident summary
Open safety action items
OSHA compliance status

Commissioning

Commissioning schedule
Open Cx punch items
NETA testing plan
Task Board
Backlog0
In Progress0
Review0
Completed0

Folders

Quick Specifications Reference
260500
Common Work Methods
261000
MV Electrical
262000
LV Distribution
263200
UPS / BACOP
264300
Generators / ATS
265100
Lighting Interior
265600
Lighting Controls
260526
Grounding / Bonding
264600
NETA Testing
250000
EPMS
270500
Structured Cabling
271500
ERRCS / DAS
283100
Fire Alarm
283200
VESDA
262816
Switches / Breakers
260553
Seismic / ISAT
Document Intelligence
Organization Chart
Executive PM
Executive
Senior PM
Management
General Superintendent
Field Ops
Safety Manager
Safety
PM
Management
Commissioning Mgr
Commissioning
Scheduling Mgr
Scheduling
QA/QC Mgr
Quality
Sr Accountant
Finance
Energy Marshal
Energy
Superintendent
Field Ops
APM
Management
Sr PE
Engineering
BIM Coordinator
Engineering
Field Engineer
Field Ops
General Foreman
Field Ops
PE
Engineering
BIM Modeler
Engineering
Agents
Prompt Runner
Select a prompt from the list to preview...
Construction Technology Tools

Procore

Project Management

Unified construction management for RFIs, submittals, daily logs, and change orders.

Bluebeam Revu

Document Review

PDF markup, takeoff, and real-time collaboration for plan review and QC.

Autodesk ACC

Cloud Platform

Autodesk Construction Cloud for design coordination and model management.

BIM 360

BIM

Connected BIM workflows for model coordination, clash detection, and field use.

Navisworks

3D Review

3D model aggregation, clash detection, and 4D schedule simulation.

Primavera P6

Scheduling

Enterprise-level project scheduling, resource management, and critical path analysis.

MS Project

Scheduling

Project planning, Gantt charts, and team collaboration for schedule management.

Accubid

Estimating

Electrical estimating software for accurate bid preparation and cost analysis.

ETAP

Engineering

Electrical power system analysis, arc flash studies, and coordination.

Bluerithm

Commissioning

Digital commissioning platform for test scripts, checklists, and turnover.

PlanGrid

Field

Field productivity with plan access, punch lists, and progress photos.

iAuditor

Safety

Digital inspections, safety audits, and corrective action tracking.

Power BI

Analytics

Business intelligence dashboards and data visualization for project insights.

SAP / Dynamics

ERP

Enterprise resource planning for finance, procurement, and HR management.

Textura

Finance

Construction payment management, lien waivers, and compliance tracking.

Infrastructure & Security

Document Security Protocols

  • All project documents classified at minimum Confidential level
  • Role-based access control (RBAC) enforced on all platforms
  • 256-bit AES encryption for data at rest and in transit
  • Multi-factor authentication required for all system access
  • Daily automated backups with 30-day retention
  • Audit logging on all document access and modifications
  • DLP policies preventing unauthorized data export
  • Annual penetration testing and security assessments
Total Bill of Materials
62 Items | $197K - $284K
ROI Calculator
ROI
0%
Annual Savings
$0
Payback Period
0 mo
Total Cost
$0

Savings Breakdown

Monthly Savings Trend

Cost Analysis

Scenario Comparison

Role-by-Role Savings

RoleAgentsHrs/WkAnnual Savings

Cost Breakdown

CategoryAmount
IT Tickets
IDSubjectPriorityStatusAssigneeCreated

Project Configuration

AI Agent Settings

Select AI model for agent responses:

API Integration Status

Procore
Connected
Autodesk
Token expiring
Microsoft
Connected
Bluebeam
Disconnected

Notification Preferences

Email Notifications
Task Assignments
Schedule Alerts
Safety Alerts
Document Updates

Training Resources

Phase 1: Foundation (Days 1-3)

System onboarding, role configuration, platform navigation, and basic prompt engineering.

Phase 2: Integration (Days 4-7)

Tool connections, document workflows, team collaboration, and automated reporting.

Phase 3: Advanced (Week 2)

Custom agent creation, advanced analytics, workflow automation, and API integrations.

Phase 4: Mastery (Week 3+)

Performance optimization, ROI tracking, continuous improvement, and knowledge sharing.

Daily Checklist

  • Review overnight agent activity reports
  • Check safety dashboard for alerts
  • Update task board and priorities
  • Review new RFIs and submittals
  • Run schedule variance analysis

ARTECK Assistant